The main barrier to moving into the mill is completing water and septic systems, which are now nearly finished after multiple setbacks.

  • Septic installation — Pump and tank were drained and positioned outside the kitchen to handle gray and black water once connected .

  • Filtration sequence — Borehole water oxidizes in elevated tanks, settles, then passes through disc filter, iron removal tank, and 20/5/1 micron stages before entering the house .

  • Plumbing fixes — Missing O-rings and loose fittings caused leaks; new parts from the store allowed final assembly and pressure testing at two bar .

  • System flush — Backwash and regen cycles cleared black sediment, confirming flow into the house line for the first time .

  • Milestone check — Pump house work is complete and last entry tiles are set, leaving only debris removal and final utilities before habitation .